Blog Archives

Canyon Lake High School

Owner: Comal Independent School District Description: Project included a two level reinforced concrete frame building. First floor framing is soil supported and the columns are supported on drilled piers. Generally, the roof framing consists of steel joists supported on concrete, or steel wide flange beams and metal deck. Project Size: 300,000 square feet Project Cost: […]

Lacoste Elementary School

Owner: Medina Valley Independent School District Description: Project included a single level reinforced concrete frame classroom building, with two gymnasiums kitchen, cafeteria and library. Entire structure is supported on drilled piers. Roof framing consisted of wide flange beams, steel joists and metal deck. Project Size: 100,000 square feet Project Cost: $13,000,000.00

Corbett Junior High School

Owner: Schertz Cibilo Independent School District Description: Project included a two level reinforced concrete frame building. First floor framing is suspend and supported on drilled straight shaft piers. Generally, the roof framing consists of steel joists supported by concrete perimeter beams and steel wide flange beam. Roof framing over locker rooms consists of 8” precast […]