Canyon Lake High School
Owner: Comal Independent School District
Description: Project included a two level reinforced concrete frame building. First floor framing is soil supported and the columns are supported on drilled piers. Generally, the roof framing consists of steel joists supported on concrete, or steel wide flange beams and metal deck.
Project Size: 300,000 square feet
Project Cost: $44,000,000.00