Blog Archives

Sotomayor High School

Owner: Northside Independent School District Description: Project included a three story classroom building, 500 seat auditorium with an orchestra pit, two gymnasiums and general support areas. Supported on 70’ deep straight shaft piers, the building contains an underfloor area. The first floor framing is a reinforced concrete cast-in-place system. The superstructure for the gymnasium and […]

John Marshall Harlan High School

Owner: Northeast Independent School District Description: Project included a multi-level reinforced concrete frame structures, supported on drilled and under-reamed piers, with a portion of the second floor framing consisting of post-tension beams. The Auditorium and three Gymnasiums on campus are comprised of long-span roof framing. The roof framing is steel and metal deck. Project Size: […]

Dr. Hector Garcia Middle School

Owner: Northside Independent School District Description: Project included a two level reinforced concrete frame building. First floor framing is soil supported and the columns are supported on drilled piers. Generally, the roof framing consists of steel joists supported on concrete, or steel wide flange beams and metal deck. Project Size: 180,000 square feet Project Cost […]