Corbett Junior High School

Owner: Schertz Cibilo Independent School District

Description: Project included a two level reinforced concrete frame building. First floor framing is suspend and supported on drilled straight shaft piers. Generally, the roof framing consists of steel joists supported by concrete perimeter beams and steel wide flange beam. Roof framing over locker rooms consists of 8” precast hollow core planks. Three types of metal deck were utilized in this project: 1 1/2” type B 20 gage, 3” type NA, 20 and 2 1/2” Epic deck.

Project Size: 250,000 square feet

Project Cost: $38,000,000.00

Lacoste Elementary School

Owner: Medina Valley Independent School District

Description: Project included a single level reinforced concrete frame classroom building, with two gymnasiums kitchen, cafeteria and library. Entire structure is supported on drilled piers. Roof framing consisted of wide flange beams, steel joists and metal deck.

Project Size: 100,000 square feet

Project Cost: $13,000,000.00

Judson High School

Owner: Judson Independent School District

Description: Project included a two level reinforced concrete frame building. First floor framing is suspended, and supported on drilled piers. Generally, the roof framing consists of steel joists supported on concrete, or steel wide flange beams and metal deck.

Project Size: 400,000 square feet

Project Cost: $85,000,000.00

Canyon Lake High School

Owner: Comal Independent School District

Description: Project included a two level reinforced concrete frame building. First floor framing is soil supported and the columns are supported on drilled piers. Generally, the roof framing consists of steel joists supported on concrete, or steel wide flange beams and metal deck.

Project Size: 380,000 square feet

Project Cost: $44,000,000.00

Dr. Hector Garcia Middle School

Owner: Northside Independent School District

Description: Project included a two level reinforced concrete frame building. First floor framing is soil supported and the columns are supported on drilled piers. Generally, the roof framing consists of steel joists supported on concrete, or steel wide flange beams and metal deck.

Project Size: 180,000 square feet

Project Cost: $38,000,000.00

We will add more projects as more photography becomes available. To see a full list, view the resumes of our engineers on the team page.