Judson Lake High School

Judson Lake High School

Owner: Judson Independent School District

Description: Project included a two level reinforced concrete frame building. First floor framing is suspended, and supported on drilled piers. Generally, the roof framing consists of steel joists supported on concrete, or steel wide flange beams and metal deck.

Project Size: 400,000 square feet

Project Cost: $85,000,000.00