Blog Archives

South San Antonio ISD New Primary Gymnasium

Owner: South San Antonio Independent School District Description: Project included a multi-level, reinforced concrete frame building. First floor was soil supported construction, with drilled piers supporting columns. Roof framing consisted of steel trusses supporting long span joists, and wide flange beams. Acoustical metal deck was chosen because of the use. Project Size: 41,641 square feet […]

South San Antonio High School New Classroom Building

Owner: Comal Independent School District Description: Project included a three level reinforced concrete frame building, supported on drilled straight shaft piers. Steel roof framing with metal deck. Central Energy Plant is concrete frame floor framing and roof structure. Columns are supported on drilled piers. Project Size: 271,908 square feet Project Cost: $45,000,000.00

SAISD Burbank High School Addition & Renovation

Owner: San Antonio Independent School District Description: Project included a two story classroom bar, an auditorium, a mall and support areas. The floor framing plan is suspended cast-in place, with drilled piers supporting the columns. The superstructure for the entire building is a reinforced concrete system. Post-tension beams frame the second floor of the classroom […]